This project involved constructing new stormwater and wastewater infrastructure using precision trenchless thrusting methods to ensure minimal surface disturbance in a highly serviced and compact urban environment. SMD’s experienced team implemented controlled directional thrusting, achieving accurate alignment and depth without open trenching. This method reduced reinstatement costs, maintained the integrity of the road surface, and ensured a faster turnaround.
BEULAH AVENUE HAMLIN ROAD - Rothesay Bay
