Project Brief
Super Mario Drainage was engaged to deliver the drainage infrastructure package for Air Liquide’s new industrial facility, which required stormwater and wastewater solutions to support operations involving gas storage and distribution. Works included:
- Construction of soakpits, catchpits, and pipeline designed to meet Watercare and Auckland Council compliance.
- Coordination of live tie-ins to existing public networks while minimising disruption to neighbouring industrial operators.
- Implementation of erosion and sediment control (ESC) measures for all excavation works on the constrained site.
Relevance
- Challenges: The site’s industrial operations required strict compliance with hazardous materials management. Coordination was needed with Air Liquide’s safety protocols to ensure all drainage works could proceed without interfering with operational safety zones.
- Solutions: A staged construction approach allowed existing site operations to continue while drainage upgrades progressed. ESC measures were implemented to ensure zero discharge of sediment-laden water into the stormwater network.
- Team Approach: Collaboration with Air Liquide, the main contractor, and consultants ensured that trade waste requirements, hydraulic capacity, and safety standards were all met.
- Outcome: The project was completed on time and within budget, providing Air Liquide with a compliant, durable drainage system that supports both environmental protection and operational efficiency.