Project Brief
SMD was appointed to provide drainage upgrade project in Wade Heads. The works involved construction of a new gravity-driven stormwater network to replace and extend existing infrastructure within a constrained residential environment.


Relevance

  • Challenges: The site’s steep gradient demanded careful control of pipe alignments, bedding stability, and flow velocities. Riparian protection and sediment control were critical due to proximity to natural outfalls and potential erosion during construction. Restricted working space and ongoing residential access required a clear sequence plan to minimize disturbance and safety risk.
  • Solutions: Optimized the hydraulic gradient to achieve efficient stormwater flow while maintaining cover and minimizing excavation volumes. Incorporated 7 MPa concrete bedding to midheight and anchor blocks to stabilize pipes on steep slopes. Worked closely with Keola (Main contractor) to refine access and construction methods, ensuring cost efficiency and smooth implementation.
  • Team Approach: SMD collaborated directly with the contractor, surveyor, and council drainage engineers to confirm levels, connectivity, and compliance with three-waters design standards. Regular site coordination meetings and design eviews ensured all issues were resolved proactively before construction.
  • Outcome: SMD delivered a fully compliant, maintainable stormwater system integrating new and existing assets. Improved drainage performance and reduced downstream erosion risk through the adoption of riprap energy-dissipation.